The site itself provided additional challenges - the proximity of mature trees and existing site buildings precluded the entry of heavy equipment into the site.

All excavation was done by hand, as was the creation of a small mountain to provide the height needed for a waterfall. The relatively small space available meant that every inch had to be used productively. Careful and thorough design was a must!

bup
b42 b38

Sitemap

home2 logonew